Northern VA Pipe Replacement

This project consisted of a 2,500’ replacement section on an existing 24” pipeline due to urban expansion from a recent subdivision development. Our team completed the preliminary civil survey and mapping for the project. This video shows part of the replacement section. A large bridge was being built across the pipeline as part of this sub development.

F/S Project

Leesburg Area F/S Installation

This project consisted of adding a new F/S at a compressor station in northern Virginia to address the insufficient filtration capacity. Our team prepared a grading plan and completed the as-built survey and completion records for the project.

Western PA Pipe Replacement

This project consisted of an 8,500’ replacement section on an existing 20” pipeline. Our team completed the preliminary civil survey, mapping, securing road crossing & driveway permits, and as-built survey for the project. This aerial image shows the tie-in location.

Pipeline Replacement
Pipeline Project Management

Northern PA Gathering Pipeline

This project consisted of 2.5 miles of 16” diameter pipeline installed in northern Pennsylvania. Our team managed the project as well as completing material procurement, bidding documents, inspection, and completion records for the project.

Tank Replacement Project

This project consisted of replacing three existing tanks at a compressor station in northern Pennsylvania. Two of the tanks had to remain in service while the new tanks were installed. Our team completed the civil survey, civil foundation design for the new tanks, mechanical design, and tank specifications for the project. This aerial image from our drone shows the three existing tanks to be replaced.

Compressor Station Tanks
Heater Replacement Project

Heater Replacement Project

This project consisted of replacing an existing heater with a new heater.  Our team completed the mechanical and civil drawings for the project. This aerial image shows the site with the existing heater connected, and the replacement heater staged on-site for installation.

Pipeline Replacement

This project consisted of an 8,500’ replacement of old 7” bare steel pipe with new 12” FBE coated steel pipe in Pleasants County, West Virginia. Our team completed the preliminary survey and mapping for the project. This aerial view shows the route of the replacement section.

Greens Run Replacement
HM-50 Replacement

Pipeline Reroute

This project consisted of a 1,500’ replacement and reroute of a 14” bare steel pipeline with 12” FBE coated steel pipe into an area with greater soil stability. Our team completed the routing of the new line as well as the preliminary survey and mapping for the project.  This image shows a portion of the alignment sheet with the area being avoided.

8" Pipeline Design

This project consisted of 3,300’ of new 8” steel pipeline with two HDDs. Our team managed this project on behalf of our customer.  We also completed the HDD design, material sourcing, construction documentation, project inspection, survey as-builts, and DOT completion record book assembly. This image shows a portion of the HDD drawing crossing beneath four foreign pipelines.

HDD Design