top of page
I3 Engineering Headquarters.webp

Drone Footage (8x Speed)

Northern VA Pipe Replacement

Location

Northern Virginia

Services​​​

Mapping

Surveying
Drone

This project involved the replacement of approximately 2,500 feet of an existing 24-inch pipeline to accommodate urban expansion associated with a new subdivision development.

I3 Engineering performed the preliminary civil survey and mapping required to support planning and design of the replacement section. As shown in the video, a large bridge was constructed over the pipeline corridor as part of the broader subdivision infrastructure improvements, requiring careful coordination to protect the existing asset and ensure long-term integrity.

bottom of page