Tank Replacement Project
Location
Northern Pennsylvania
Services
Piping & Mechanical
Civil Engineering
Inspections
Materials
Surveying
This project involved the replacement of three existing tanks at a compressor station in northern Pennsylvania. To maintain continuous operations, two of the existing tanks were required to remain in service throughout construction, necessitating careful sequencing and coordination.
I3 Engineering performed the civil survey, developed the civil foundation design for the new tank installations, completed the mechanical design, and prepared detailed tank specifications to support procurement and construction. The project was executed with a focus on safety, constructability, and minimal operational disruption.
The aerial drone image above shows the three existing tanks scheduled for replacement.