WV Well Pad & Compressor Station

Location

West Virginia

Services

 

Cathodic Protection

Compliance

PHMSA Mega Rule Pt. 3

PADEP 25 Pa. Code 78a.68g

Well Pad & Compressor Station

Engineering Design

Project Management

When a valued client needed to meet critical safety and regulatory requirements, they turned to our experienced Operations and Compliance Team.

The goal? Ensure the client’s well pad piping, compressor station, and gathering pipeline are fully compliant with the rigorous below-grade corrosion protection standards outlined in the PHMSA Mega Rule Part 3 and PADEP 25 Pa. Code § 78a.68g.

To meet these standards, our team of experts designed and implemented a cutting-edge cathodic protection system, including a deep well anode bed and rectifier. From initial concept through final installation, our team provided comprehensive oversight and delivered a seamless, high-quality solution.

 

The photos above showcase the ground bed installation, which consists of anodes buried deep underground and connected to the structure being protected to redirect corrosion away and preserve system integrity.

At I3 Engineering, we’re proud to be your trusted expert for cathodic protection and compliance services.