When a valued client needed to meet critical safety and regulatory requirements, they turned to our experienced Operations and Compliance Team.
The goal? Ensure the client’s well pad piping, compressor station, and gathering pipeline are fully compliant with the rigorous below-grade corrosion protection standards outlined in the PHMSA Mega Rule Part 3 and PADEP 25 Pa. Code § 78a.68g.
To meet these standards, our team of experts designed and implemented a cutting-edge cathodic protection system, including a deep well anode bed and rectifier. From initial concept through final installation, our team provided comprehensive oversight and delivered a seamless, high-quality solution.
The photos below showcase the groundbed installation, which consists of anodes buried deep underground and connected to the structure being protected to redirect corrosion away and preserve system integrity.
At I3 Engineering, we’re proud to be your trusted Mid-Atlantic partner for project management, engineering, surveying, and inspection services across the natural gas and emerging energy markets.